Major Maintenance FY 21
Project Manager: Roseann Sillasen
___________________________________________________________________________________________________________________
Work performed and completed Summer/Fall 2020
-Capital & MM FY20 Projects - Construction Completed Summer 2019
-Capital & MM FY21 Projects - Construction Completed Summer 2020
___________________________________________________________________________________________________________________
Project Specifications for all projects and scopes will be available in OneDrive:
|
Building Name |
Building Address | Project Name | Proposed Maintenance |
| Student WF | 5 Vine St | Exterior-Reinforce west entry stair and landing | Reinforce West Stair System |
| Student WF | 1 Vine Street | Fire alarm | Replace Fire alarm system with an addressable system |
| Schonberg Dance Studio | 247 Pine Street | Fire Alarm | Replace fire alarm panel. |
| Religious Studies | 171 Church Street | Fire Alarm Replacement | Replace Fire alarm system with an addressable system |
| Student Offices | 190 High Street | Fire Alarm Replacement | Replace Fire alarm system with an addressable system |
| CFA Theater | Washington Terr | Fire Alarm system | Install new fire alarm system in CFA Theater. Address performance space requirements. |
| Student WF | Campus wide | Flooring-Structural reinforcement | First floor structural reinforcement in student housing. |
| Vine St Parking Lot Entrance | Vine St | Grounds-Repave entry to parking lot | Repave south entrance only to Vine Street parking lot. |
| 200 Church | 200 Church Street | Grounds-Retaining Wall | Remove and rebuild east retaining wall and walk, install stairs, remove and grade balance of area. |
| Student WF | 14 Fountain Ave | Electrical panel | Electrical panel upgrade, new wiring, lighting |
| Student WF | 162 Church St | Roof | Main house roof replacement (included in GC package) |
| CFA Art Studio North | Washington Terr | Roof | Roof replacement |
| FAC Hockey Rink | 161 Cross St | Roof | Roof replacement |
| Foss Hill 4 | Foss Hill Drive | Roof | Roof replacement, roof hatch with guard rail installation. |
| Van Vleck Observatory | Foss Hill Drive | Roof | Large Dome roof repairs. |
| Fauver Apartments | 19 Foss Hill Drive | Roof Replacement | Roof replacement |
| Exley Science Tower | 265 Church St | Elevator Upgrade | Upgrade Freight Elevator |
________________________________________________________________________________________________________________
AR=Alan Rubacha arubacha@wesleyan.edu
ACAD=Academic Admin=Administrative Infra=Infrastructure RP=Rental Properties SLF=Student Life Facilities SLF-WF=Student Life Facilities-Woodframes ATH=Athletics
CPP=Central Power Plant AAF=Academic & Administrative Affairs MH=Manhole DDC=Direct Digital Controls GFI=Ground Fault Interrupt SW=southwest ADA=Americans with Disabilities Act
CFA=Center for the Arts